Spec. 1-16 Location of non-oil filled electrical equipment

Spec. 1-17 Location of oil filled pad-mounted equipment (1 of 2)

Spec. 1-17 Location of oil filled pad-mounted equipment (2 of 2)

Spec. 1-19 General clearance for pad-mounted switchgear

Spec. 1-20 Installation procedure for protective bollards used with pad-mounted equipment

Spec. 1-23 Clearance required at swimming areas, fountains and similar installations

Spec. 1-43 Trenching for underground cables

Spec. 1-44 URD layouts

Spec. 1-45 Subdivision staking requirements for all Tampa Electric equipment in easements

Spec. 1-46 Staking requirements for apartments and zero lot line applications

Spec. 1-47 Site preparation, three-phase pad-mount transformer installation

Spec. 1-48 Site preparation, single-phase pad-mount transformer installation

Spec. 6-1 Poured in place concrete pullbox and handhole design

Spec. 6-2 "S" Type precast manhole 8' X 12' X 7' (1 of 2)

Spec. 6-2 "S" Type precast manhole 8' X 12' X 7' (2 of 2)

Spec. 6-3 Precast 5' X 10' - 6" X 7' concrete pullbox/splicebox (1 of 2)

Spec. 6-3 Precast 5' X 10' - 6" X 7' concrete pullbox/splicebox and accessories (2 of 2)

Spec. 6-4 Precast 6' X 12' X 7' concrete pullbox/splicebox (1 of 2)

Spec. 6-4 Precast 6' X 12' X 7' concrete pullbox/splicebox and accessories (2 of 2)

Spec. 6-5 Precast 4' - 4" X 13' - 4" X 6' - 0" concrete pullbox/splicebox (1 of 2)

Spec. 6-5 Precast 4' - 4" X 13' - 4" X 6' - 0" concrete pullbox/splicebox and accessories (2 of 2)

Spec. 6-7 Polymer concrete pullbox 30" X 60" X 48"

Spec. 6-8 Precast 10' - 0" X 8' - 6" X 7'- 0" T-type manhole

Spec. 6-9 Precast manhole 10' X 10' X 7' (1 of 2)

Spec. 6-9 Precast manhole 10' X 10' X 7' (2 of 2)

Spec. 6-11 Pad design for single-phase pad-mounted transformers

Spec. 6-12 Pad design for three-phase pad-mounted transformers

Spec. 6-18 Conduit/pad details - 600 AMP - P.S.E multi-compartment gang-operated

Spec. 6-20 Pad detail for pad-mounted secondary termination cabinet

Spec. 6-21 Splicebox/light traffic handhole 30" X 48" X 18"

Spec. 7-16 Conduit detail for three-phase pad-mounted transformer

Spec. 11-2 Secondary connectors single-phase URD pad-mount transformer

Spec. 12-26 Pad-mounted secondary cabinet (1 of 3)

Spec. 12-26 Pad-mounted secondary cabinet (2 of 3)

Spec. 12-26 Pad-mounted secondary cabinet (3 of 3)

Spec. 13-17 Minimum space requirements for flammable liquid filled pad-mounted transformer in indoor vault

Spec. 13-21 Minimum space requirements for 600 AMP auto-throwover pad-mounted switching equipment (PSE) on grade indoor vault (1 of 2)

Spec. 13-21 Minimum space requirements for 600 AMP auto-throwover pad-mounted switching equipment (PSE) on grade indoor vault (2 of 2)

Spec. 13-23 Typical pit and conduit detail for 600 AMP manual and auto-throwover pad-mounted switching equipment vault (1 of 3)

Spec. 13-23 Typical pit and conduit detail for 600 AMP manual and auto-throwover pad-mounted switching equipment vault (2 of 3)

Spec. 13-23 Typical frame & cover details 600 AMP manual and auto-throwover pit area (3 of 3)

Spec. 13-25 Typical space and installation requirements for metering cabinets

Spec. 13-27 Vault space requirements for metal enclosed switchgear

Spec. 13-29 Typical conduit details pad-mount transformer in indoor vault

Instrument Transformer Rated Meter Sockets (approved list for use in Tampa Electric Service areas only)

Approved Metering Equipment Enclosure List (approved for use in Tampa Electric Company, Florida Power & Light and Progress Energy Company service areas)